|
2011 Topographical & Cadastral survey of the project area,detailed study of the project area system and identification of the problems & Redesigning of irrigation and Drainage systems of Haidergarh branch canal (Km 22.98 to tail) system, covering GCA of approx 0.98 lac ha in Gomati - Sai basin, situated in Barabanki, Sultanpur & Raibarely district in Uttar Pradesh
2012 Study of Benchmarking and Water Auditing of Indira Gandhi Canal (Stage-I)
2013 Survey, Design and Related Services of canals and structures on Main and Distributaries canals of high level canal Range-1 canal system (Orrisa Integrated Irrigated Agriculture and Water Management Investment Programme , OIIAWMIP)
NKBPL is now empaneled with Government of Jharkhand State Govt for Water and Sanitation Works
NKBPL is now Empanelled with GSPC in Gujarat State
NKBPL completes GIS/MIS mapping on OMS Module for all GSS Stations in Rajasthan
NKBPL completes Master Plans for Five Towns in State of Rajasthan
NKBPL Completes Development Plan Preparation for Bhavnagar Town in Gujarat State
October 10, NKBPL gets mandate for Consultancy Assignment for Preparation of the City Development Plan for Neemach and Agar Town of Madhya Pradesh
August2010,NKBPL gets mandate for Preparation of Draft Master Plan for Neemkathana and Falna Towns
May-2010, NKBPL gets mandate for Consultancy services for design of Barrage, Power House and Other Civil Structures in Co-ordination with E/M works of Bathnaha HEP (4 x 2 MW) including Planning for execution.
Nov -09 , Stakehodlers Conference at Agar and Neemuch receives wide response
Nov-09. NKBPL gets mandate for Preparation of Feasibility Report for Dudu-Sambhar State High No:2 in Rajasthan
Nov-09, NKBPL empanelled by Naya Raipur Development Authority for Architecture, Urban Planning, Engineering Services and Bid Process Management
Dec-09, NKBPL receives wide response at NRLMP Fair, New Delhi.
Dec- 09 NKBPL gets mandate from Indian Oil for DETAILED ENGINEERING SURVEY, CADASTRAL SURVEY & PROVIDING SERVICES for establshing ROU in ROW for Laying Pipeline from Sanganer to Bijbasan.
B-2 Bypass Designed by NKBPL becomes operational.
Feb-10, NKBPL gets mandate for Preparation of Catchment Area Treatment Plan for 8000 sqkm area for Parwan River
NKBPL empanelled by PFC Consulting Limited for GeoTechnical, Socio-Economic, Topographical Survey,Area Drainage Studies, EIA, Resettlement and Rehabilitation Plan, Transportation Studies, Power Tranmission Survey and Report Preparation
April-10, NKBPL gets mandate for preparation of Detailed Project Report for Conservation and Beautification of Five Lakes in state of Rajasthan from RUIDP, NLCP
May-10, NKBPL gets manade from Bihar State Hydropower Corporation for Hydro Electric Project
June-10, NKBPL gets mandate for development of Ring Road and other infrastrctrue activities for Bhavnagar Area Development
|